Floor Project - Day 4 and 5
O.M.G. I was so exhausted last night. We put the last piece of wood in around 9 and got most of the house put back together. I put everything else back this morning with the exception of everything in the kitchen.
Day 4 started with half of the house done.

The living room was the final part that we had to do

And finally it was done!!

A little clean up and everything could go back in place

Day 5 - Putting Everything Away
This morning I got up and put everything back where it belongs
From the living room, looking down the hallway to the front door

From the front door, looking into the living room

The dining room

Jazzy's playroom